Planning resources

    Useful guides for a better building decision

    Focused answers to the questions homeowners ask before appointing a contractor: typical costs, what a quote should include, how planning affects a project and which evidence to request. Prices exclude VAT and professional fees, and links point to the relevant service, area and completed-project pages.

    QUICK BUDGET & TIMELINE ESTIMATOR

    Get a rough idea of the build cost for a typical kitchen / side return extension or a typical rear dormer loft with an en-suite.

    Project Calculator

    22.5m²
    10m²40m²

    Typical build price (ex VAT)

    £90,000–£100,000

    Typical build

    Around 13 weeks

    Build price to a fitted shell: kitchen units, flooring and other second-fix items are supplied by you.

    Guide only, for a typical specification. Typical project build prices, excluding VAT and professional fees (design, structural engineer, Building Control, party wall and planning fees). Prices are the same across every borough we cover; access and logistics (parking, skips, scaffold, restricted access) can affect the final price. Your fixed quote follows a site visit.

    Get a tailored quote
    Construction cost calculations with pen and paper

    Get a fixed quote after a free site visit.

    Strengthened articles

    Start with the guides closest to your decision

    Reviewed October 2026

    House renovations

    Can You Live at Home During a House Renovation in London?

    Staying at home during renovation? Plan usable rooms, temporary facilities, service shutdowns and safe access, and understand when moving out makes more sense.

    living at home during renovationhouse renovation Londonrenovation phasing
    Read the guide
    House renovations

    House Renovation Costs in Richmond: What Affects Your Quote?

    Planning a Richmond house renovation? Understand how scope, structure, finishes, access and allowances affect your quote before choosing a builder.

    house renovation cost RichmondRichmond renovation quoteEast Sheen house renovation
    Read the guide
    Rear extension with skylight and modern kitchen in Wandsworth, South West London by Bluebird Spaces
    Extensions

    Wraparound Extensions SW London: Planning & Party Walls

    Wraparound extension planning in Wandsworth, Lambeth, Merton, Richmond and Fulham: why most need an application, party walls, steels and build steps.

    wraparound extensionwraparound extension planningside return extension
    Read the guide
    Loft structures under construction across two neighbouring terraced houses in Fulham, West London
    Loft conversions

    Mansard Loft Conversions SW London: Planning by Borough

    Mansard loft conversions in Wandsworth, Fulham, Clapham, Wimbledon and Richmond: what each council's guidance says, party walls, building regs and pricing.

    mansard loft conversionmansard loft conversion planningloft conversion Fulham
    Read the guide
    Loft conversion under construction in Wandsworth
    Loft conversions

    Loft Conversion Building Regulations: Fire & Stairs

    Building regulations for a SW London loft: fire doors, interlinked alarms, the staircase, steels, insulation, approval times and sign-off.

    loft conversion building regulationsloft fire safetyloft staircase
    Read the guide
    Completed Southfields loft conversion with dormer windows in Wandsworth SW18 by Bluebird Spaces
    Loft conversions

    How Long Does a Loft Conversion Take? Week by Week

    Our week-by-week loft conversion timeline, from site visit to handover, with real SW London project durations and what slows approvals down.

    how long does a loft conversion takeloft conversion timelineloft conversion
    Read the guide
    Timber roof structure during a loft conversion
    Loft conversions

    Hip-to-Gable Loft Conversions in SW London: Guide

    Hip-to-gable loft conversions on SW London semis: the 50 m³ PD limit, Wandsworth and Merton guidance, party walls, building steps and pricing.

    hip to gable loft conversionhip-to-gableloft conversion planning
    Read the guide
    Completed open-plan kitchen and rear extension in a whole-house renovation in Wimbledon SW19
    Extensions

    Double Storey Extensions in SW London: Planning Rules

    When a double storey extension needs planning in Wandsworth, Merton, Richmond, Lambeth and Hammersmith & Fulham, plus CIL, party walls and how it's built.

    double storey extensiontwo storey extensiondouble storey extension planning
    Read the guide
    Single-storey rear kitchen extension with garden glazing in East Sheen, SW14, built by Bluebird Spaces
    Planning

    6m Rear Extensions: Prior Approval in SW London (2026)

    Build a single-storey rear extension up to 6m (8m detached) without full planning in Wandsworth, Merton or Richmond: limits, 42-day process, £249 fee.

    prior approvallarger home extensionrear extension permitted development
    Read the guide
    Completed dormer loft conversion in Southfields, SW18, built by Bluebird Spaces
    Putney

    Putney Loft Conversions: Planning Route by Street (2026)

    Does a Putney loft need planning? Permitted development limits, Article 4 in Dover House Estate and Commondale, LDC fees, and typical rear dormer prices.

    loft conversion PutneyPutney planning permissionArticle 4 Putney
    Read the guide
    Rear kitchen extension with rooflight in Wandsworth, SW18, built by Bluebird Spaces
    Wandsworth

    Wandsworth Kitchen Extensions: Cost, Timeline, Planning

    What a Wandsworth kitchen extension costs ex VAT and fees, how long it takes and when you need planning, based on two real SW18 builds by Bluebird Spaces.

    kitchen extension Wandsworthside return extensionSW18 kitchen extension
    Read the guide
    Loft structure under construction across two terraced houses in Fulham, West London
    Choosing a builder

    Choosing a London Renovation Contractor: Comparing Quotes

    Check a renovation contractor's references, insurance and project evidence, then compare London building quotes on scope, allowances, VAT and payment terms.

    choosing a renovation contractor Londoncompare builder quotesbuilder references
    Read the guide
    Wandsworth Town station entrance, SW18
    Loft Conversions

    Loft Conversion Types: Dormer, Hip-to-Gable, Mansard

    Dormer, L-shaped, hip-to-gable or mansard? Which loft suits Wimbledon and Wandsworth houses, the Class B PD limits and what each council expects.

    loft conversion typesWimbledon and Wandsworth loftsdormer loft
    Read the guide
    Richmond

    Richmond Extension Ideas by House Type: Side Return, Rear or Wraparound?

    Which extension suits a Richmond terrace, semi or detached house? Side return, rear, wraparound and two-storey ideas, the design rules that shape them and what drives cost.

    Richmond extension ideasside return ideasRichmond planning
    Read the guide
    Fulham

    Renovating a Fulham Terrace: A Pre-Build Checklist

    Before renovating a Fulham terrace or flat: ownership and licence to alter, conservation areas and Article 4, surveys, building regs and questions for builders.

    Fulham renovation checklistFulham terracesflat renovation Fulham
    Read the guide
    Clapham

    Clapham Side Return Planning: Lambeth or Wandsworth Rules?

    Planning a side return or wraparound in Clapham? Lambeth or Wandsworth, permitted development limits, conservation areas, Party Wall Act notices and drains.

    Clapham side return planningside return extensionLambeth planning
    Read the guide
    Wimbledon

    Wimbledon Planning Portal, Article 4 & CIL: Merton Guide

    How to search Merton's planning portal for Wimbledon, the PD rules, John Innes Article 4 areas and the CIL form to file before you start.

    Wimbledon planningMerton Article 4John Innes conservation area
    Read the guide
    Painted Wandsworth Town sign under the railway arches, SW18
    Wandsworth

    Wandsworth Article 4: The 8 Areas & What Needs Permission

    Wandsworth's 8 Article 4 conservation areas explained: which roof, window and front changes need planning, and how to check your street first.

    Wandsworth Article 4Wandsworth conservation areasloft conversion planning
    Read the guide
    Richmond

    Richmond Article 4 & Extensions: A Homeowner's Guide

    Article 4 and conservation areas in Richmond, Barnes, Sheen and Twickenham: what needs permission, how to check your house, and the extension route.

    Richmond Article 4Richmond conservation areashouse extension planning
    Read the guide
    Scaffolded Bluebird Spaces loft conversion site with branded van in South West London
    Party walls

    Party Wall Timeline for Lofts & Extensions in SW London

    When to serve party wall notices for a loft or extension, what each notice period means, and a week-by-week timeline from drawings to start.

    party wall noticesparty wall agreementloft conversions
    Read the guide
    Exposed timber floor and roof structure during a Bluebird Spaces loft conversion in South West London
    Loft conversions

    Loft LDCs in SW London: Refusal Rates by Borough

    How lawful development certificates for lofts work, how often SW London councils refuse them, and the PD rules that trip applications up.

    lawful development certificateloft conversion planningpermitted development
    Read the guide
    Exposed timber floor and roof structure during a Bluebird Spaces loft conversion in South West London
    Loft conversions

    Loft Conversion Costs in South West London: A Clear 2026 Guide

    Bluebird's typical rear dormer loft price, how rooflight, L-shaped and mansard conversions differ, what changes the price and what an itemised quote should show. Prices exclude VAT and professional fees.

    loft conversion costsSouth West Londondormer loft conversions
    Read the guide
    Extensions

    House Extension Costs in South West London: What a Quote Should Include

    A practical extension cost guide: Bluebird's typical kitchen / side return price (ex VAT and professional fees), what changes it, and the questions that make contractor quotes comparable.

    Read the guide

    Use every guide with the same three checks

    Confirm whether every figure includes or excludes VAT and professional fees.
    Match planning advice to the exact property type, address and current council guidance.
    Ask for comparable completed projects, an itemised scope and a written payment schedule.
    Get Started

    Ready to talk about your project?

    Free site visit, then a fixed-price quote. No deposit upfront.