Loft conversion cost calculator for London
Choose your house, the type of loft, its length and whether you want a bathroom. We show a guide build price for lofts in South West and West London, from Wandsworth and Clapham to Wimbledon, Fulham and Richmond.
Prices exclude VAT and professional fees. A rear dormer with a bathroom on a terraced house under 6 m long is about £53,000–£60,000.
Loft conversion cost by type
Guide build prices for a terraced, semi-detached or detached house with a loft under 6 m long, excluding VAT and professional fees. A loft 6 m or longer sits higher in the range.
| Loft type | No bathroom | With a bathroom |
|---|---|---|
| Rooflight (Velux-style) | £40,000–£45,000 | £43,000–£50,000 |
| Rear dormer | £50,000–£55,000 | £53,000–£60,000 |
| L-shaped dormer | £60,000–£65,000 | £63,000–£70,000 |
| Hip-to-gable | £60,000–£65,000 | £63,000–£70,000 |
| Mansard | Priced at site visit | Priced at site visit |
What changes the cost of a loft conversion
- The type of loft: a rooflight conversion changes the least, a dormer adds full head height, and hip-to-gable, L-shaped and mansard lofts change more of the roof.
- Size: a longer roof means a bigger dormer, more floor and more steel.
- A bathroom: plumbing, drainage and tiling add cost.
- The new stair: where it lands and how much of the floor below it takes.
- Structure: the steel beams and new floor the room needs.
- Access and logistics: parking, skips, scaffold and getting materials up to the roof.
How long a loft conversion takes
Around 13 to 15 weeks on site is a realistic target, and larger or more complex schemes take longer. Before that come the survey, drawings, any planning application or Lawful Development Certificate and party wall notices.
Planning, permitted development and party walls
Outside a conservation area, many dormer and hip-to-gable lofts on houses can go ahead as permitted development if they add no more than 40 m³ of roof volume on a terraced house, or 50 m³ on a semi-detached or detached house. In a conservation area, a roof extension needs a householder planning application, and permitted development does not apply to flats.
If your loft involves work on a shared wall, you will usually need to serve party wall notices on your neighbours before work starts. See our party wall notice timeline.
What the calculator cannot tell you
It cannot see the roof timbers, the head height under the ridge, where the stair can go or how easy your street is to work on. It also cannot tell you your planning route. We check all of this at the site visit, then send a fixed-price quote on the agreed scope.
Lofts we have built
- Southfields dormer loft conversion, SW18 14 weeks from start to finish, with structural steelwork, upgraded insulation and rooflights.
- Battersea loft conversion, SW11 Delivered in 15 weeks, with a new en-suite and bespoke storage.
- Richmond loft conversion, TW9 A principal bedroom suite with an en-suite, walk-in wardrobe and about 500 sq ft of added space.
See our loft conversions page, or read what our clients say.
Loft conversions near you
Guides to read next
- Loft conversion costs in South West London
- Loft conversion types: dormer, hip-to-gable, mansard
- Hip-to-gable loft conversions
- Mansard loft conversions and planning
- How long a loft conversion takes, week by week
- Lawful Development Certificates for lofts
- Loft conversion building regulations
- Party wall notice timeline
- Extension cost calculator
Get a fixed price for your loft
Free site visit, then a fixed-price quote. No obligation.
Send the form to book your visit. Your estimate and the choices you made go with it, so we can come prepared.
Prefer to talk? Call 07564 041115 or email admin@bluebirdspaces.co.uk.
